National Repository of Grey Literature 2 records found  Search took 0.01 seconds. 
Design of excavation and primary tunnel lining on high-speed railway construction
Dostál, Tomáš ; ING, Tomáš Zítko, CEng MICE, EUR (referee) ; Horák, Vladislav (advisor)
As part of modernization of the Brno-Přerov railway line, is in the section between village Blažovice and town Vyškov desined tunnel composed of two monorail tubes about 640 meters length. Tubes are situated in neogenic clay with an overburden height of 11 meters. This master thesis deals with design suitable tunnel exavation, primary lining with static calculation and geotechnical monitoring.
Design of excavation and primary tunnel lining on high-speed railway construction
Dostál, Tomáš ; ING, Tomáš Zítko, CEng MICE, EUR (referee) ; Horák, Vladislav (advisor)
As part of modernization of the Brno-Přerov railway line, is in the section between village Blažovice and town Vyškov desined tunnel composed of two monorail tubes about 640 meters length. Tubes are situated in neogenic clay with an overburden height of 11 meters. This master thesis deals with design suitable tunnel exavation, primary lining with static calculation and geotechnical monitoring.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.